Skip to content
← Warehouse building with associated infrastructure

Fire-fighting water tank with pump room

Reinforced concrete tank and pump room structure, founded on piles.

Type
Cast-in-situ reinforced concrete structure on piles
Material
Concrete C30/37, reinforcing steel B500SP
Dimensions
26.8 × 14.3 × 5.6 m

3D structural model

Reinforced concrete structure of the tank and pump room with piles. The site ground is on a separate layer — it can be hidden or left as context for the foundation.

Loading 3D model…

Documentation

Selected sheets from the detailed design documentation.

Formwork — part 1
01Formwork — part 1
Wheel — zoom · drag — pan · double-click — reset